 |
| Chemist
| |
| Following a career based on a technical back ground in power plant commissioning related with chemical responsibility. I have been involved in commissioning of 4x323 MW Oil fired thermal Power Station at HUBCO POWER PLANT I was involved in the commissioning of Demineralization, waste water treatment, sampling system with on line analyzers, chemical injection system of boiler condenser and feed water system. Set-up the Laboratory having Water and Oil analysis latest equipment.
After the successful commissioning of thermal Power Station I join Ansaldo Energia (Italian Organization) for the commissioning of combine cycle power station at LIBERTY POWER LIMITED. Where I was involved in the commissioning of Demineralization system with latest Semines PLC control system, Cooling Tower dosing system, waste water treatment system, Oily waste system, pre treatment system (Clarified water). And others chemical responsibility.
| |
| Resume reference: | sattMrLJ | |
| Date last updated: | 6 August 2008 | |
| | | |
| Education: | University degree - chemistry | |
| Experience: | 10 years or more | |
| Employment situation: | In permanent employment | |
| Salary expectations: | 60,000 A$/year | |
| Availability: | From 3 September 2008 | |
| Type of employment: | Full Time, Part Time, Home Based | |
| Location: | Abroad - Pakistan | |
| Looking to work in: | NSW/Wollongong, NSW/Other, QLD/Gold Coast, QLD/Sunshine Coast, QLD/Townsville, SA/Adelaide | |
| Age: | 37 | |
| Gender: | Male | |
| Marital status: | Married | |
| Own transport: | Yes | |
| Driver's license: | Yes | |
| Citizenship: | Pakistan | |
| Right to work | No, I need sponsorship | |
| English level: | Fluent | |
|
To access the full details of this candidate,
please log-in to the control panel first. |
|  |
|
 |